Blink IQ 200 Advanced vs EATON Green Motion Building Pro

The Blink IQ 200 Advanced outputs 80 A (19.2 kW) versus 48 A (11.52 kW) for the EATON Green Motion Building Pro — about 67% faster charging on vehicles that can accept it. The EATON Green Motion Building Pro draws less standby power (4.64 W vs 5.9 W). The EATON Green Motion Building Pro has the longer charging cable (25 ft vs 24 ft).

Blink IQ 200 Advanced EATON Green Motion Building Pro
Connector type J1772 J1772
Max output current 80 A 48 A
Max output power 19.2 kW 11.52 kW
Wi-Fi / app connected Yes Yes
Cable length 24 ft 25 ft
ENERGY STAR certified Yes Yes
Input voltage 240 V 240 V
Standby power draw 5.9 W 4.64 W

Frequently asked questions

Which is faster, the Blink IQ 200 Advanced or the EATON Green Motion Building Pro?

The Blink IQ 200 Advanced: 80 A (19.2 kW) against 48 A (11.52 kW), provided your EV's onboard charger can use the extra power.

Are the Blink IQ 200 Advanced and EATON Green Motion Building Pro both ENERGY STAR certified?

Yes — every charger in this database is drawn from the U.S. EPA ENERGY STAR certified EVSE list.