EATON Green Motion Building Pro vs Electron Charger ECEVC-L2-19KW-C
The Electron Charger ECEVC-L2-19KW-C outputs 80 A (19.2 kW) versus 48 A (11.52 kW) for the EATON Green Motion Building Pro — about 67% faster charging on vehicles that can accept it. The EATON Green Motion Building Pro draws less standby power (4.64 W vs 6.43 W). The EATON Green Motion Building Pro has the longer charging cable (25 ft vs 16 ft).
| EATON Green Motion Building Pro | Electron Charger ECEVC-L2-19KW-C | |
|---|---|---|
| Connector type | J1772 | J1772 |
| Max output current | 48 A | 80 A |
| Max output power | 11.52 kW | 19.2 kW |
| Wi-Fi / app connected | Yes | Yes |
| Cable length | 25 ft | 16 ft |
| ENERGY STAR certified | Yes | Yes |
| Input voltage | 240 V | 240 V |
| Standby power draw | 4.64 W | 6.43 W |
Frequently asked questions
Which is faster, the EATON Green Motion Building Pro or the Electron Charger ECEVC-L2-19KW-C?
The Electron Charger ECEVC-L2-19KW-C: 80 A (19.2 kW) against 48 A (11.52 kW), provided your EV's onboard charger can use the extra power.
Are the EATON Green Motion Building Pro and Electron Charger ECEVC-L2-19KW-C both ENERGY STAR certified?
Yes — every charger in this database is drawn from the U.S. EPA ENERGY STAR certified EVSE list.